Ok Tedi Mining Ltd – BIGE Operations

Supply, Installation and Commissioning of 738kW PV, 750 kWa with a 3600 kWh Battery Storage System. This project was designed to provide high-capacity, reliable energy to the BIGE operations area.


in New
Sign in to leave a comment